Friday, 9 November 2012
ZXSDR BS8900 Configuration
- RC8910 Radio Frequency Cabinet
- ZXSDR RC8910A Cabinet for BS8900A
- BS8900 Cabinet Cable
- Spare parts of BTS-other spare parts
- BS8900 Installation Fitting
- Digital Distribution Box (120-120)
- Data Trunk Cable (120ohm)
- BBU inside install materials
- Wall-mounted Assembly
- BBU Power input cable
- Protective ground wire
- Relay-contact alarm cable
- Necessary installation accessories
- Digital Distribution Box (120-120)
- Data Trunk Cable (120ohm)
ZXSDR BS8800 GU360 Configuration
BS8200 module
Control and Clock Module 2
Site Alarm Module
Power Module
Fabric Switch Module
BBU Frame
Universal Baseband Processing board for GSM
Universal Baseband Processing board for GSM
RSU60 GU188
RSU60E GU188B
Jumper cable
1/2 Jumper
Optical Module
1.25G/1310nm SM Optical Transceiver Module
Optical Module(RRU)
BS8800 Auxiliary Rack
BS8800 ACCESSORIAL RACK
48V DC power cord
Operational ground wire
Spare parts of BTS-other spare parts
SFP cable assembly passive
RSU RF Cable
ZXSDR BS8700 Configuration
Universal Baseband Processing board for GSM
R8860 GU908(DC,EGSM)
R8860E GU908(DC,EGSM)
RRU Single Mode Fiber(LC/PC)
RRU Engineering Accessory
R8860 GU188(DC)
R8860E GU188B(DC)
RRU Installation Kit Set
RRU Single Mode Fiber(LC/PC)
RRU Engineering Accessory
RRU to RRU jumper
RRU to RRU fiber
RRU power cable
RRU cover
RRU Installation Kit Set
Yellow green grounding cable
Outdoor Lightning Protection Box(DC)
DC Outdoor Lightning Arrester Installation Kit Set
LPB installation material
LPB Alarm cable
LPB power cable
LPB grounding kit
PVC Tape
Whether tape
Jumper cable
1/2 Jumper
Optical Module
1.25G/1310nm SM Optical Transceiver Module
RU License
RSU/RRU License
Indoor Lightning Protection Box
ILP48-3 Indoor Lightning Protection Kit
LPB installation material
LPB Alarm cable
LPB power cable
LPB grounding kit
PVC Tape
Whether tape
Spare parts of BTS-other spare parts
RRU RF Cable for Cascade
Site Alarm Extending Module
Telecom Engineering SDR(Software Defined Radio)
SDR stands for software defined radio.It is new technology that is most common used by almost all operators.SDR is the equipment of ZTE.The big reason of using SDR is so costless and reliable.
- BTS 8700
- BTS 8900
- BTS 8800
Some picture of SDR model equipment.
RRU GU188
RRU GU908
Remote Radio Unit(RRU) |
Remote Radio Unit
Fiber Port LC-1 |
Fiber Port LC-2 |
Wednesday, 7 November 2012
Telecommunication Engineering Logistic Department Scope Of Work
In telecommunication engineering logistic department handle all the equipment regarding to the site.
Scope of work
- Collection of site material from the warehouse.
- Arrange the transport
- Safe and secure delivery to site.
- Safe unloading of site materiel at site
- Return dismantle equipment to warehouse
Telecommunication Engineering(Operation Flow)
Information & Documentation Flow In Delivery Phase
Logistic Department(Material Collection and Site Delivery)
Logistic Department(Material Return to Warehouse From Site)
Tuesday, 6 November 2012
PPE In Telecommunication Engineering
PPE is also an important feature like HSSE.
P-Personal
P-Protection
E-Equipment
When any person working on height they must have their Personal Protection Equipment(PPE) or tools.
Gloves
P-Personal
P-Protection
E-Equipment
When any person working on height they must have their Personal Protection Equipment(PPE) or tools.
PPE Requirements |
Harness
Helmets
Heigh Visibility Clothing
Safety Boots
Safety Belts
Safety Comes First When We Working On Site or On Height.
Civil Work Engineering Department Scope Of Work
Civil work engineering relates to the construction of site's civil work construction have different steps.
Step-1
Identify the location of site(tower) construction.
Step-2
Vendor, Operator & Subcontractor Meet with the site owner and make an agreement with the owner of the site.
Step-3
Work started on the site.
Step-4
Concrete pouring with the mixture of sand,crush and cement.
Step-5
Make the base of the site(Tower) .
Step-6
Then make the column of the site(Tower).
Step-7
Tower Erection Started.
Pictures of Civil Work Construction will be uploaded soon....
Step-1
Identify the location of site(tower) construction.
Step-2
Vendor, Operator & Subcontractor Meet with the site owner and make an agreement with the owner of the site.
Step-3
Work started on the site.
Step-4
Concrete pouring with the mixture of sand,crush and cement.
Step-5
Make the base of the site(Tower) .
Step-6
Then make the column of the site(Tower).
Step-7
Tower Erection Started.
Pictures of Civil Work Construction will be uploaded soon....
Approved Material By Telecommunication Companies |
Different Departments In Telecommunication Engineering
Now we will discuss about the different departments in telecommunication engineering.
The Departments Are Listed Below
- Civil Work Department
- Logistics Department
- Operation Department
- Maintenance Department
- Managed Services Department
- Backup Support Department
- Sales Department
- Data Com Department
All those department in telecommunication have their unique values and have strong assets to run the big organizations like Huawei, Ericson, NSN, ZTE etc...
These Department have there core values to perform their task.
Introduction Of Telecommunication
From the start of this blog we will introduce you to about the basics of telecommunication sector.
First We will discuss about the sectors so.
What is sector?
sector is direction that is calculated by the compass.i hope every engineer have aware with the compass.compass is tool that give us director of East West North and South.with the help of compass we identify the sector.There are three sector in every telecommunication standard.
Sector 1 Or Sector A (This may have degree of 0-60 or 0-80)
Sector 2 Or Sector B (This may have degree of 60-120 or 80-160)
Sector 3 Or Sector C (This may have degree of 120-above or 160-above)
These sector consist of different telecommunication equipment's.
Telecommunication Engineering |
Subscribe to:
Posts (Atom)